JOHANNESBURG, January 31 /PRNewswire-FirstCall/ -- Gold Fields Limited ("Gold Fields") (NYSE, JSE, DIFX: GFI) is disappointed to confirm that Eskom has informed the Company that authorisation to increase electricity load from 80% to 90% by this evening, has been temporarily withdrawn in order to "protect further frequency decay and system instability."
To comply with this instruction, and in the interest of safety, production at Gold Fields' operations is being pulled back to the 80% power level.
READ THE REST
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment